What is the standard injection mold development process?
Original: Original | Author: DGMF Mold Clamps | Publish Time: 2020-04-21 | 14878 Views | Share:
Before drawing the final assembly drawing of the mold, the process drawing should be drawn up, and it should meet the requirements of the workpiece drawing and process data. The size guaranteed by the next process shall be marked with the words "process size" on the drawing. If, after molding, no other machining is performed except for repairing burrs, the process drawing is exactly the same as the workpiece drawing.

Mark the height of the cavity (not required, as required) and the overall size of the mold.

Auxiliary tools (tools for removing parts and molds, calibration tools, etc.).

Compile all part numbers in sequence and fill in the detailed list.

Mark the technical requirements and instructions for use.

Technical requirements of the assembly drawing of the mold:

For the performance requirements of certain systems of the mold. For example, assembly requirements for the ejection system and slider core pulling structure.

Requirements for the mold assembly process. For example, after the mold is assembled, the bonding gap of the bonding surface of the parting surface should not be greater than the parallelism requirements of 0.05 mm above and below the mold, and the size determined by the assembly and the requirements for this size are pointed out.

The use of mold, assembly and disassembly method.

Anti-oxidation treatment, mold number, lettering, marking, oil seal, storage and other requirements.