Waiting for you to follow us in these SNS, thank you. 
0086-17322110281
info@moldclamps.net

DGMF MOLD CLAMPS CO., LTD
·

Complete Specifications

Adequate Inventory

Factory Outlet

Fast Delivery

Quality Assurance

Competitive Price

Customizable

Our Mold Clamps Make Your Machines More Efficient And Durable, Lower Maintenance Costs!

Request for Inquiry
MOLD CLAMPS
+
+
NEWS    PRODUCTS
DGMF MOLD CLAMPS CO., LTD

Dynamic news
How to install a punching mold?
Original: | Author: dgmfmoldclamps | Publish Time: 2020-03-21 | 12503 Views | Share:
How to install a punching mold?

3. Responsibilities: The mold adjuster implements this work instruction.

4. Working Procedure

4.1 According to the production operation plan, determine the type and label of the mold to be used.

4.2 Familiar with the stamping process specification and the requirements of each process to be debugged.

4.3 Check whether the dimensional parameters of the mold to be installed can meet the equipment specifications specified by the process.

4.4 Check the molds used, grasp the structural characteristics and operation methods of the molds, and note the matters needing attention.

4.5 Select the machine tool according to the process specifications and check whether the parts work normally. If the parallelism of the machine tool needs to be checked, notify the mechanic.

4.6 Before installing the mold, wipe the machine table, slider and the upper and lower surfaces of the mold clean.

4.7 The height of the mold and the height adjustment of the machine tool can only be placed under the mold; if it needs to be placed on the upper mold, it should be placed under the guidance of the mold repairman.